24 September 2011

Design on existing concrete structure 2002






Selected program: Theater
The choosing of the program evokes a specific spatial experience. Interaction of movement and function was the basic condition. Events insight the structural vacuous space, the exposed movement trough the suspended functional chambers, allow the possibility of witnessing the everyday events.   

Light industrial materials of metal and wood form folding surfaces which are suspended from existing concrete beams and pillars.
Basic design lines shape the main functional spaces of the theater, the amphitheater and the cloak room so that these spaces can be recognized within the whole structure. These lines seam to float between the concrete structures as light and non permanent spatial forms, as folded surfaces that wrap spaces. The distinction of the new structure is obvious through exterior and interior perspective views.